Skip to content
12Past performance library

Your projects, on file. Every rating cites one.

Past Performances is the library of contracts your company has delivered — client, role, dates, value, task areas. The capability matrix scores every requirement against it, so a rating is only ever as good as what is here.

Past performance library — The projects your fit is scored against
Overview

The projects your fit is scored against

For keeping your own contract history where the matrix can read it.

Past Performances is the list of your company’s own delivered contracts: title, client, role, contract number and type, period of performance, total value, the contracts point of contact, the work in brief, how it is relevant, and the task areas it covered.

Capture and proposal staff keep it current. The Capability Matrix reads the whole library every time it scores a requirement, and a 4 or 5 rating is impossible without an active project in it.

It replaces the past-performance folder on the shared drive and the write-up someone rebuilds from memory for every proposal.

How it works

Past performance library, step by step.

  1. Step 1: Add a project

    Add past performance opens a form. Title, client, role, contract number, contract type, a brief description, the period-of-performance dates and the total contract value are required; the NAICS code, the contracts point of contact, relevancy notes and task areas are optional. Each card on the list shows the essentials, with View, edit and delete.

    Screenshot: The Past Performances list: an Add past performance button and a project card showing the role, contract number, period of performance, total contract value and contract type.

  2. Step 2: Describe the relevance

    Open a project to read it the way an evaluator would: chips for role, contract type and NAICS, the contract number, period and value, the brief description, and Relevancy — size, scope, scope areas and magnitude.

    Screenshot: A past-performance record opened: role, contract type and NAICS chips, the contract number, period and total value, the brief description and the Relevancy section.

  3. Step 3: Break the work into task areas

    Transition-in, the task areas one by one with what was done under each, and transition-out. These are the lines the matrix matches requirements against.

    Screenshot: The scope areas, magnitude and task areas of a past-performance record.

  4. Step 4: Let the matrix read it

    When you score a capability matrix, every project in the library is sent with each batch of requirements. A requirement gets a 4 or 5 only if a project whose period of performance has not ended supports it; a 5 also needs that project’s client to be the target agency. The matched projects are shown beside every rating.

Details

The specifics.

Numbers, limits and sources, checked against the product as it runs today.
  1. Fields: project title, client, role, period of performance (start and end), contract number, contract type, total contract value, contracts point of contact (name, title, phone, e-mail), NAICS, brief description, relevancy (size, scope, scope areas, magnitude), transition-in, task areas, transition-out, and the solicitation number and title it was bid under.

  2. Required to save: title, client, role, contract number, contract type, description, period-of-performance dates and total contract value.

  3. Active or not is computed from the period-of-performance end date each time the matrix runs — nothing to tick.

  4. The whole library is sent with every scoring batch of 40 requirements, up to 120,000 characters of project text.

  5. A 4 or 5 requires an active project; a 5 requires that project’s client to be the target agency. With no matching project a requirement is rated 1 and marked as a gap.

  6. The library is maintained by hand. Nothing is copied into it from USAspending or GovWin.

  7. Anyone signed in to your workspace can add, edit and delete entries; there is no separate permission for the library.

Data behind Past performance library

Source 01
Your own contract history, entered and maintained by your team
Refresh
Whenever you save. The matrix reads the library at the moment you press Score.
In plain English

The words, explained.

Past performance
Your company’s record of contracts delivered — the evidence a proposal cites and the matrix scores against.
Period of performance
The dates a contract ran, start to end. A project whose end date has not passed counts as active.
Total contract value
The full value of the award — TCV on the card.
Task area
One unit of work under a contract. The matrix matches solicitation requirements against these.
Questions

What people ask about Past performance library.

Short answers here. The playbook has the long ones, screen by screen.

Still have a question? Book a working session

Want it walked through on your own pursuit?

Bring one solicitation. In forty-five minutes we import it, pull the incumbent’s award history, and show you Past performance library working on it. You keep the record either way.

  • GovWin under your own licence
  • USAspending needs no account
  • Nothing you upload trains a model