Topic 05 of 12
Pipeline and gate review
Eight stages on one board, drag-and-drop moves, and a formal gate between Qualification and Capture that only people with the authority can open.
Where to find it
- Sidebar → Pipeline (Board or List view)
- Inside an opportunity → the pipeline-stage stepper in the right-hand rail
Identification — found and imported, not yet examined.
Qualification — checking the incumbent, the fit and the P-Win. The gate review sits at the end of this stage.
Capture — writing the plan to win.
Proposal — writing the response to the solicitation.
Pending Award — submitted, waiting for the government’s decision.
Awarded (Submitted) — won.
Lost (Submitted) — submitted and not won.
Not Submitted — pursued, then dropped before submission.
- Board: one column per stage. A card shows the title, priority, assignees and days in the current stage. Drag a card to move it.
- List: the same pursuits as a sortable table — title, GovWin ID, stage (with an inline dropdown), date, progress, assignees and priority.
- Search across both views; administrators can also filter by owner.
- “Guided access” walks a new user through the board in four short steps.
A gate review is a formal yes or no before a pursuit is allowed to consume proposal resources. In GovCon it sits between Qualification and Capture, and it is enforced, not just drawn.
Move a card from Qualification into Capture — or any later stage.
If the person moving it holds the “Approve gate reviews” permission, the move is approved as part of the move.
Otherwise the card shows “Pending review” and waits there until someone with the authority clicks “Approve gate”.
Moving the card back before Capture clears the pending flag.
- Priority is Low, Medium or High and can be changed inline on a card or row.
- Add or remove assignees inline. Assignees are notified — in the app, and instantly by email if they have that switched on.
- Assigning others, removing other people’s assignments, and assigning yourself are three separate permissions.
Every stage entry is timestamped. The Notes & Timeline tab of the opportunity draws a pipeline timeline from those timestamps, so days-per-stage is a number rather than a memory. Stage changes also appear as notifications for the people assigned, and in the Opportunity logs.
An expiring contract on the Recompetes page can be pushed straight into the pipeline: it lands in Qualification, assigned to you.
Related
- OpportunitiesEvery pursuit you follow — imported from GovWin IQ with its linked data and organised into your own lists.
- Recompete RadarEvery contract in your market that expires in the next twelve months, sorted by urgency, with the incumbent named — and one click to push it into your pipeline.
- Roles and permissionsThree roles set the defaults; seventeen permissions, switched per user, decide exactly who can see, edit, move, approve and administer.
- Capture DocumentThe plan to win, written with your team in one place: thirteen lettered sections, a P-Win scorecard, comments and mentions, live presence, and a print-ready PDF.